X-Ray Equipment Preventive Maintenance
Radiographic Department Design
Equipment Moves & Construction Build Out Assistance
Annual Calibration
Department Appraisals
Power Conditioners
Processor Preventative Maintenance
Service Contracts
Special Service Offers
Request a Service Call
| 
Recommended every two to four weeks depending on volume:
 |
Drain and remove chemistry
|
 |
Remove, soak, and clean the racks
|
 |
Rotate the rollers
|
 |
Flush pumps
|
 |
Clean the tanks
|
 |
Check parts (gears, rollers, seals)
|
 |
Verifying operations, flow rates, and temperature
|
 |
Troubleshoot for problems
|
 |
Add fresh chemistry
|
 |
Reassemble
|
 |
Chemicals are precisely mixed to manufacturer's specifications (100% strength)
|
 |
Drain clearers, algae tabs etc as required
|
|