Emergency Service & General Repairs

X-Ray Equipment Preventive Maintenance

Radiographic Department Design

Equipment Moves & Construction Build Out Assistance

Annual Calibration

Department Appraisals

Power Conditioners

Processor Preventative Maintenance

Service Contracts

Special Service Offers

Request a Service Call

Recommended every two to four weeks depending on volume:
    Drain and remove chemistry
    Remove, soak, and clean the racks
    Rotate the rollers
    Flush pumps
    Clean the tanks
    Check parts (gears, rollers, seals)
    Verifying operations, flow rates, and temperature
    Troubleshoot for problems
    Add fresh chemistry
    Reassemble
    Chemicals are precisely mixed to manufacturer's specifications (100% strength)
    Drain clearers, algae tabs etc as required
[HOME][ABOUT US][PRODUCTS][SERVICES][ORDER ONLINE][COMP-RAY CONNECTION][SPECIAL OFFERS]
[PREFERRED VENDORS][CONTACT US]